                                    Building EnhancementsIn Girvetz Hall inoperable shades were replaced with blackout curtains in 19 classrooms,flooring and walls were repaired, the stage was refinished, the lighting in 1004, 1106, 1108, 2135,2129 and 2128 was replaced, and the roof was replaced. In Campbell Hall the roof was cleaned,and interior doors were refurbished and hardware was replaced. In South Hall room 1431 wastransitioned into a 76-seat project-based learning classroom.
                                