Page 7 - Demo
P. 7


                                    Environmental Health & Safety%u2022 Developed a virtual Emergency Operations Center.%u2022 Reviewed over 100 Worksite Specific Safety Plans with site-visitscompleted at over 200 campus buildings, departments or areas.%u2022 Coordinated with multiple groups/agencies (NASA, OregonState, Woods Hole, UK National Oceanic Institute) to developprotocols for the shipment, use, and disposal of radioactivematerial in international waters in the Atlantic.%u2022 Completed 23 Title 19 Building inspections, achieving > 97%compliance.%u2022 Inspected all laboratory buildings in collaboration with FMbefore they were reoccupied as part of the COVID-19 ResearchRamp up.%u2022 Removed the perchloric acid fume hood from Earth Science, incollaboration with DCS. This was a high-hazard task due to thepotential deposition of explosive metal perchlorate salts in theductwork and fan. %u2022 Developed an Aerosol Transmissible Diseases exposure controlplan for the Police department.%u2022 Consulted on the establishment of a new CLIA-certified COVID19 diagnostic lab on campus.%u2022 Completed the American Academy of Underwater SciencesDive Safety Audit.%u2022 Worked with Campus Dining and Basic Needs to ensure allunits and programs met new COVID-19 industry guidelines whilestill adhering to CA Retail Food Code.Facilities Management%u2022 Joined UCOP Wholesale Power Program which provides 100%carbon-free electricity for the campus.%u2022 Installed new LED lighting in 9 major campus buildings toincrease lighting quality.%u2022 Saved the university an anticipated $100,000 in electricalutility bills through installation of the more efficient LEDlighting%u2022 Completed over $5 Million in Deferred Maintenance Projectsin partnership with DCS. %u2022 Evaluated and inspected campus building water and HVACsystems to support the return of researchers, faculty, staff andstudent population.%u2022 Installed hand sanitizing stations and COVID-19 signage in allcampus academic, research and administrative buildings.%u2022 Custodial teams assembled and refreshed building entrancesand hallways and applied a high polish shine on the floors.%u2022 Trade staff (Electricians, HVAC Mechanics, Plumbers, Painters,Carpenters) concentrated on work requests and reduced thenumber of requests by approximately 35%.10,000+Face Coverings Distributed$5M+ Completed DeferredMaintenance Projects
                                
   1   2   3   4   5   6   7   8   9   10   11